Storms and even hurricanes no problem for Atlantis PQ semi
AuthorsJaap de Wilde
Conference/JournalMARIN Report 79
Date1 Apr 2003
Reading time3 minutes
MARIN puts one of the largest semi-submersibles through rigorous testing in the Offshore Basin but the semi has no difficulty surviving in even the most extreme conditions.
stability, seakeeping and ocean engineeringmeasurements and controldata sciencerenewablesoil and gasinfrastructuremarine systemslife at seamodel testingoffshore engineering