LNG Parallel Loading concept tested on MARIN's bridge simulator
AuthorsDimitri van Heel
Conference/JournalMARIN Report 117
Date22 Apr 2016
Reading time3 minutes
Since 2010 MARIN has been involved in several test cases with the HiLoad DP system, an L-shaped body that can attach itself to the keel of a vessel using suction plates.