Show all publications

Deep pit attracts full-tendon Shenzi TLP

AuthorsOlaf Waals & Arjan Voogt
Conference/JournalMARIN Report 91
Date1 apr. 2007
Reading time3 minutes

With its deep pit of 30 metres, the Offshore Basin offers the possibility of testing TLPs with their full-tendon length, even in ultra-deep waters. This allows reliable testing, including important effects such as set-down and the related airgap in large waves. These benefits attracted BHP Billiton, MODEC and SEA Engineering to select MARIN for Shenzi TLP model testing. Report explains.

Contact

Contact person photo

Olaf Waals

President

Arjan Voogt

Manager

Tags
stability, seakeeping and ocean engineeringmeasurements and controldata sciencerenewablesoil and gasinfrastructuremarine systemslife at seamodel testingvortex induced motions (vim)offshore engineering