AuthorsDimitri van Heel, Janou Hennig & Pieter Aalberts
Conference/JournalMARIN Report 111
Date25 Apr 2014
Reading time6 minutes
MARIN carried out model tests, real-time simulations and a full-
scale monitoring campaign considering different operational and design aspects of the CLOV FPSO, installed off Angola.